Premier Service Installations have vast experience in many different sectors.
Should you need support for installation of a new high rise residential block, or you are planning to upgrade the heating system within an occupied school, PSI have the experience, skills and capacity to ensure that your project is completed on time and too the best of our ability.
Why no get in touch and let us turn an idea into reality.
The British Museum
Psi were contracted by MJL to participate in the construction of the new British museum extension.
Psi were instructed to install the main drainage and rainwater systems in HDPE. This consisted of a size range between 56mm and 300mm of pipework.
Psi also installed the mains water services, Bcws, hot and hot return ranging from 100mm to 15mm copper all of which was a brazed system.
Psi also carried out pumped waste systems in screwed galvanized steel to the below ground area's where no gravity drainage was available.
Psi were instructed to remove and replace any damaged existing svp/rwp systems on the outside of the building using heritage timesaver fittings and pipework.
If want to learn more about Premier service installations projects please Get in touch
Bluewater Shopping Centre
Premier Service Installation had been contracted by Howfire to undertake the installation of all the Fire Sprinkler Safety System at the Bluewater Shopping Centre.
This included the following -
Wet Riser,
Dry Riser,
Landlords sprinkler system.
If want to learn more about Premier service installations projects please Get in touch
St Bartholomew’s Hospital
Premier Service Installations Ltd were contracted by Skanska to participate in the construction of the new block at the St Bartholomew's Hospital.
Premier Service Installation installed the internal soil, waste & vent pipework serving the various sanitary fittings throughout the building. We also installed a new syphonic rainwater system to drain water from many roof areas at different levels.
We were also responsible for the installation of new domestic hot & cold water and low temperature hot water services within the existing hospital as part of some refurbishment works.
Other works completed by Premier Service Installations Ltd as part of this contract included new external aluminium guttering and downpipes to the central courtyard shelters, and new pipework supplying the existing courtyard water fountain.
If want to learn more about Premier service installations projects please Get in touch